The collection contains a series of architecutral plans and letters for Barclay Hall (completed 1877) including: a letter from the Haverford Executive Committee outlining proposed costs and donations, initial plans for the hall with first and second story floor plans drafted by Addison Hutton (Barclay's architect), a correspondence between G. Rhodes (the building's plumber/gas fitter) and Yarnall and Cooper (the project's contractors), proposals on ways to reduce building costs, and contracts for the construction of Barclay as well as the installation of its boiler.

Dates

  • Creation: 1875-1877

Creator

Access Restrictions

The collection is open for research use

Use Restrictions

Standard Federal Copyright Law Applies (U.S. Title 17)

Historical Note

Barclay Hall is a student dormitory on the campus of Haverford College. Begun in 1876 and completed in 1877, Barclay was the first dedicated student dormitory built on campus and features gothic revival architecture, complete with pointed arches above the main enterances and a steeply pitched roof intersected by the occasional dormer. Barclay was originally built with a central, medieval-themed, tower; however, this architectural element was destroyed in a 1946 fire of unknown origin. Over the years, Barclay has been home to a host of Haverford students, regularly switching between upperclass and first-year housing.

Extent

0.02 linear ft. (1 folder )

Language of Materials

English

Abstract

The collection contains a series of architecutral plans and letters for Barclay Hall (completed 1877) including: a letter from the Haverford Executive Committee outlining proposed costs and donations, initial plans for the hall with first and second story floor plans drafted by Addison Hutton (Barclay's architect), a correspondence between W.S. Rhodes and the building's contractor (Yarnall and Cooper), proposals on ways to reduce building costs, and contracts for the construction of Barclay as well as the installation of its boiler.

Arrangement

Materials are arranged chronologically, beginning with the anticipated costs and ending with the work contracts.

Acquisition

Unknown

Related Materials

Addison Hutton papers (HC.MC-1122)

Processing Information

Processed by Cullen Worth, completed June, 2024

Title
Barclay Hall construction collection
Status
Completed
Author
Cullen Worth
Date
June, 2024
Description rules
Describing Archives: A Content Standard
Language of description
English
Script of description
Latin

Find It at the Library

Most of the materials in this catalog are not digitized and can only be accessed in person. Please see our website for more information about visiting or requesting repoductions from Haverford College Quaker & Special Collections Library

Contact:
370 Lancaster Ave
Haverford PA 19041 USA US